Home
Forums
Job Posts
Classifieds
Groups
Events
More ...
Recommendation
Language
English
Dutch
Login
Signup today!
Home
Email
Password


Forgot password?

Need a login?
Signup today!
Ed Hoogerwerf
Sr. Lead Instrument & Control System Designer

Personal Information
First Name:  
Ed
Last Name:  
Hoogerwerf
Discipline:  
Instrumentation
Current Position:  
Sr. Lead Instrument & Control System Designer
About me:  
Thirty years experience in the petro-chemical, offshore and power station industry as an (Lead) Instrument and control system designer / design engineer.
My strengths are mainly on the diagrammatic side of projects, working on the design of control and safe guarding systems in control building rack rooms with all relevant cabinets such as: system-, marshalling-, auxiliary-, tank gauging-, vibration-, fibre patch cabinets, consoles and mimic panels.
Design of all field instruments such as: instrument location- and cable lay-outs, hook-ups, air piping details, cable lists, instrument index, block diagrams, loop sheets etc.
Preparing of requisitions, factory acceptance tests by vendors, supervising and commissioning on site.
Birthday:  
26 May 1959
(52 years old)
Gender:  
Male
Country:  
Netherlands
City:  
Schiedam
Language:  
Netherlands / English
Availability
Interested in:  
Career opportunities, Getting back in touch, Job inquiries, Business deals , Consulting offers
Statistics
Account Type: Personal Account Connections: 19 connections  
Network: Instrumentation Profile Views: 884 profile views  
Signup Date: 28-Dec-2009 Updated: 1 year(s) ago  
Subscribe to RSS
Activity
Connections
Employer
Recommendation
 
Ed's connections (19)
Search connections
« Previous Page  |  viewing results 1-10 of 19  |  Next Page »
Adri
Adri Veldhuis
Sr Instrument and Controls engineer
Updated: 2 year(s) ago
Ewald
Ewald Zandwijken
Post order manager
Updated: 2 year(s) ago
Administrator
Administrator Linked4Free
Owner Engineeringsupport.eu
Updated: 2 year(s) ago
Engineeringsupport.eu
Engineeringsupport.eu
Updated: 2 year(s) ago
Gerard
Gerard Bakker
Sr. Lead Instruments and Control Systems Designer
Updated: 2 year(s) ago
Hans
Hans Mak
SPI Administrator, Instrument Design Engineer
Updated: 2 year(s) ago
Jacques
Jacques Borst
Directeur
Updated: 2 year(s) ago
Jan WIllem
Jan WIllem Akkerman
sr Instrument Engineer
Updated: 2 year(s) ago
Jan
Jan Wijsman
Discipline supervisor
Updated: 2 year(s) ago
Herman
Herman Kaaks
Senior Project Buyer
Updated: 1 year(s) ago
« Previous Page  |  viewing results 1-10 of 19  |  Next Page »
Employer (13)

FABRICOM AT SITE BY HEEREMA

Position:Field Engineer
Time Period: Oct 2009 to present
Location:ZWIJNDRECHT
Description:New platform VALHALL for BP Norway
Checking of cable ladders and trays that are installed as per hook-up in 3D model.
Working with SPI (INtools) for helping the construction team with their problems.

SBM ATLANTIA

Position:Sr. Design Engineer
Time Period: Apr 2007 to Dec 2007
Location:HOUSTON USA
Description:Helping the design group with the conversion of an oil tanker to an FPSO ( Frade );
Checking of the Instrument index of the whole FPSO.(Topside & Vessel)
Checking of Vendor drawings for the interface signals etc.
Did all the wiring, cabinets, junction boxes and marshalling cabinets in INtools and the I/O allocation for PCS and SIS.
Learn other designers how to use INtools for the FGS system.
Checked and marked up the cable block diagrams, FGS lay-outs and Instrument field lay-outs.
Create out INtools the cable list, termination diagrams and the loopsheets etc.

GUSTO MSC

Position:Lead Designer / Expert Designer
Time Period: Dec 2007 to Oct 2009
Location:SCHIEDAM
Description:Conversion of an oil tanker to an FPSO ( P57 );
Having the responsibilities of the instrument design of the whole FPSO.(Topside & Vessel)
Leading and support of a group designers and draftsmen’s.
The set up of all the instrument drawings for the process- safety- and fire & gas installation such as cable block diagrams, field lay-outs, instrument index, cable list, termination drawings, loop sheets etc.
Checking and marking up Vendor drawings for the interface signals etc.
MOPUstor Talisman Norway;
Helping the design group with the design etc. till the P57 project started.

GUSTO MSC

Position:Lead Designer
Time Period: May 2006 to Apr 2007
Location:SCHIEDAM
Description:Conversion of an oil tanker to an FPSO ( Mondo );
Having the responsibilities of the instrument design of the whole FPSO.(Topside & Vessel)
Leading and support of a group designers and draftsmen’s.
The set up of all the instrument drawings for the process- safety- and fire & gas installation such as cable block diagrams, field lay-outs, instrument index, air piping details, process hook-ups, electrical connection details, interposing relay cabinets, cable list, termination drawings, loop sheets etc.

GTI Industry BV

Position:Design Engineer
Time Period: Aug 2004 to Oct 2004
Location:ROTTERDAM
Description:Different jobs for Shin-Etsu on the site of Shell Pernis
Preparing work packages for the subcontractor for those projects.

ABB LUMMUS GLOBAL BV

Position:Design Engineer
Time Period: Jan 2004 to Aug 2004
Location:THE HAGUE
Description:Set-up of the Instrument index in INtools 5.3 for the Scanraff project.
Preparing of requisitions for marshalling-, auxiliary-, interposing relay cabinets.

Jacobs Engineering

Position:Design Engineer
Time Period: Oct 2004 to May 2006
Location:LEIDEN
Description:Profitable Oil Movement System (PROMS) Nerefco
Preparing of cable routing layouts and cable list.
Arranging of all instruments into junction boxes in an access database.
Preparing of change over packages consisting of demolition and new drawings incl.
Work descriptions for the subcontractor.

Checking and updating of the instrument index for the HUP project (Oil Heating
Upgrade Project) of Exxon Rotterdam.
Making of requisitions for local panels, extension of consoles in the control room.
Checking of block diagrams, junction boxes, logics etc.

Helping with the 10% estimate for the Profitable Oil Movement System (PROMS)
Project on site by Nerefco.
Checking which junction box must be deleted or has to be taking over to the DCS/SGS/FGS systems.
Checking all MOV’s for the new bus system
Mechanical inspection of all 400 junction boxes incl. making pictures.
Preparing cable routing layouts and cable list.
Checking of the index against the P&ID’s.

LYONDELL NETHERLANDS

Position:Design Engineer
Time Period: Sep 2003 to Jan 2004
Location:ROTTERDAM
Description:Helping with the start up of the PO-11 plant;
Solving problems and making additional changes in the plant before start up.
Making of a manual how the PO-11 plant is built up in INtools for later modifications.

ABB LUMMUS GLOBAL BV

Position:Design Engineer
Time Period: Aug 2000 to Sep 2003
Location:THE HAGUE
Description:Set up of the control- and safeguarding and fire & gas system for Lyondell PO-11 project;
Set up of the whole field philosophy of 9600 I/O’s (separation of process units, signal type,
(analoque and digital )DCS,SIS and FGS etc.)
Preparing of rack room and control room lay-outs, arrangements of Yokogawa I/O system,
marshalling-, auxiliary-, fiberpatch- en interposing relay cabinets.
Set up of the consoles and fire and gas mimic panel, annunciators and control desk.
Making of block diagrams and system overviews.
I/O arrangement of Yokogawa and Triconex systems in INtools.
Internal cable routing layouts of the rack rooms for system- communication and power-
supply cables.
Preparing of requisitions for marshalling-, barrier-, fiberpatch-, interposing relay-, anti surge- ,telemetry cabinets and system cables.
Checking of vendor documents such as tank gauging, flowmeetering, Bentley Nevada etc.
Testing and declining of system-, marshalling cabinets, consoles and all auxiliary cabinets
by the vendors.
All cabinets (with all necessary terminals, terminal assemblies, muliplexers relay’s etc.)
system cables and field cables manufactured and connected in INtools.
Making of crosswire lists for marshalling and auxiliary cabinets etc.
Set up and drafting in ACAD of typical loop sheets for automatic loop generation from out INtools.
From October 2002 at site as supervisor and for engineering support, trouble shooter in pre-commissioning team by loop testing.

GUSTO ENGINEERING

Position:Instr. Lead designer
Time Period: Oct 1998 to Aug 2000
Location:SCHIEDAM
Description:Conversion of an oil tanker to an FPSO ( KUITO FIELD- PROSTOR II );
Having the responsibilities of the instrument design of the whole topside part.
Leading and support of a group designers and draftsmen’s.
The set up of all the instrument drawings for the process- en fire & gas installation such as cable block diagrams, field lay-outs, instrument index, air piping details, process hook-ups, electrical connection details, interposing relay cabinets, cable list, loop sheets etc.
For 3 months on site in Singapore for working on the vessel conversion for making terminal details of control cabinets for the CCR and the ECR, interposing relay cabinets, barrier panels etc. and solving problems for topsides and the vessel conversion.
2 Months working in Monaco by SBM for checking the whole as built drawing package.
Making of typical drawings for the FPSO 2000 and preparing the set up of the instrument index in INtools.

ABB LUMMUS GLOBAL BV

Position:Design Engineer
Time Period: Sep 1997 to Oct 1998
Location:THE HAGUE
Description:Shell Moerdijk MSPO 2;
Preparing of requisitions for interposing relay - en interface cabinets.
Preparing of cabinet arrangements of auxiliary cabinets and list of materials and internal wiring drawings in INtools.
Marshalling cabinets with cross wiring list, relay cabinets, cable lay-outs of field auxiliary room of incoming field cables and internal system cables

SIEMENS NETHERLAND

Position:Sr. Instr.Designer
Time Period: Apr 1995 to Sep 1997
Location:THE HAGUE
Description:Modification of a Nuclear power station in Borssele;
Engineering of the field instrumentation
Preparing of cable block diagrams, cable list, marshalling cabinets, electrical connection diagrams, junction boxes, loop sheets, cabinet arrangements engineering and commissioning activities on site (from 10-’96)

Preparing of cabinet arrangements, terminal drawings, list of materials, schematics of fire alarm cabinets.

COMPRIMO BV

Position:Sr. Instr. Designer
Time Period: Nov 1994 to Apr 1995
Location:AMSTERDAM
Description:Shell Sola Norway;
Preparing requisitions of main distribution frames, interposing relay cabinets, elco boards, system cables etc.
Drawings of auxiliary cabinets, termination drawings, cable list, loop sheets, demolition drawings etc.

Shell Fredericia Denmark;
Re-instrumentation of a refinery.
Preparing of typical loop sheets with information of a database, PEFS and existing schematics.
Preparing requisitions of junction boxes, multicores- and system cables.
Checking locations of junction boxes and cable routing in Denmark.
Bid comparison of quotations of junction boxes and cables.
Preparing of demolition drawings.
Checking of cable routing drawings and dividing MCT cable frames and making of cable cutting schedule
Recommendation
Recommended by 0 users
View All Recommenders
Recommends 0 users
View All Recommendees
Browse
Home
Forums
Job Posts
Classifieds
Groups
Events
Recommendation
Signup today!
Signup today!
Login
Invite

Copyright © 2012
FAQ
Terms of Service
Contact Us